Sutong GIL Integrated Pipe Gallery Tunnel Shield Machine Transportation Project

From:广瀛物流 Posted on:2019-10-16 Belong to:Municipal construction


Working hours: April 2017 
Project Location: Wuhu, Changshu 
Equipment specifications: The equipment is shipped in batches of 6 batches, totaling approximately 3,000 tons, 12,000 square meters. 
Put into the vehicle: axis car 
The operation contents: Daxinhuagang car board receiving goods, road transportation to Sutong GIL project site (about 5 km); Changshu power plant dock floating crane unloading and loading, road transportation to Sutong GIL project site (about 2 km).